Digital identity
Every fitting gets a name it cannot lose.
A QR code is bound to the item at coating and stays with it to the truck, so status is read rather than remembered.
Manufacturing · Customer case study
A fittings plant ran its tracking on Excel files, SAP exports, phone calls and supervisor follow ups. We gave every item a digital identity from coating to dispatch. The numbers below are theirs, not a model.
They are now rolling the same system into their other factories.
Nothing here is a projection. These are the figures the plant reported after the system went live.
mismatch complaints, down from 12 to 15 a year
faster SAP packing list generation
faster dispatch cycle
shorter order turnaround
A 40 foot container packing list used to take four to five hours to prepare. It now takes twenty to thirty minutes, and the counts on it match what is actually in the container.
Coating to QA to packing to rack to dispatch. Each step writes what happened so the next one does not have to ask.
Every fitting gets a name it cannot lose.
A QR code is bound to the item at coating and stays with it to the truck, so status is read rather than remembered.
The plant stops guessing where material is.
Each scan writes the stage and the location, so a supervisor walk is no longer the reporting system.
Passed, rejected or under rework, in writing.
Quality outcomes attach to the item itself, so nothing quietly moves forward without clearing the gate.
Stored is not the same as findable.
Rack locations are recorded at put away, which is why searches stopped eating half of every dispatch morning.
The packing list writes itself.
SAP data and scanned reality reconcile before the container is sealed, which is where the complaints used to come from.
Somebody hears about it the same shift.
Counts that do not agree stop the shipment with the evidence attached, instead of surfacing later as a credit memo.
You have a process control problem. Excel, paper, SAP exports, WhatsApp and a supervisor phone call is not a system. It is five people covering for the absence of one.
Free case study
Start with one line and one dispatch bay. We will show you what traceability looks like before you commit the floor.